My pop came by again and helped me get the last window and the slider door installed. This is the last window that went in, and the first to get trim. Hoisting the 60"x80" slider door up to hip height with limited clearance was the greatest challenge. We definitely used our degrees from the university of redneck engineering that afternoon.
Now that all openings are filled, I am out of the wind and weather for the most part. next on the agenda is sealing the roof leaks!